PHMSA
North Dakota seizes initiative in CBR degasification
Analysts, legal and financial experts weigh in on DOT’s HHFT NPRM
CBR obstacles vary, but multiply
Pushback against crude-by-rail (CBR) oil shipments continues to develop in a variety of ways, from local protests to looming action from the Department of Transportation (DOT) and the Pipeline and Hazardous Materials Safety Administration (PHMSA).
PHMSA to DOT-111 defender: Justify Bakken testing
The Department of Transportation hazardous materials regulator has quickly challenged the refinery lobby’s contention that Bakken crude falls comfortably within existing “Class 3 Flammable Liquid” and should continue to be transported in the DOT-111 general purpose tank car.
Most Bakken crude can move under FRA Emergency Order
DOT issues CBR Emergency Order
The U.S. Department of Transportation (DOT) on Feb. 25, 2014 issued an Emergency Order requiring crude oil shippers to test product from the Bakken region to ensure the proper classification of crude oil before it is transported by rail, while also prohibiting the transportation of crude oil in the lowest-strength Packing Group. DOT’s action marks the fourth Emergency Order or Safety Advisory on crude oil in the past seven months.