Maintenance of Way

TIGER, Calif. HSR absent from House spending bill

Amtrak and New York’s Gateway project got a prospective funding boost as the U.S. House of Representatives passed a $1.2-trillion omnibus package to provide all discretionary funding for the federal government for the 2018 fiscal year.

Railway Interchange: Wait until 2018 for infrastructure bill

INDIANAPOLIS – It will likely be 2018 before Congress makes good on President Trump’s pledge to pass an infrastructure spending bill, according to a member of his inner circle, just one item on a long waiting list of legislative issues concerning the rail industry.

  • M/W

New from Rails Co.: Switch heater wireless control

Rails Co.’s new wireless 900 MHz radio control system provides a wireless communication network that allows wireless control and monitoring of Rails HAB Hot Air Blower Switch Heaters, Tubular Electric Switch Heaters and Snow Detectors, as well as railway switch heating devices from other suppliers.

New M/W systems from MRT Holdings

MRT Holdings has introduced two new systems designed to help freight railroads and transit agencies improve track geometry inspection operations and work-zone sign management.

Penn State Altoona RTE program ABET-accredited

The Engineering Accreditation Commission of ABET (Accreditation Board for Engineering and Technology, Inc.), the global accreditor of college and university programs in applied and natural science, computing, engineering and engineering technology, has sanctioned Penn State University-Altoona’s Rail Transportation Engineering (RTE) degree program. The validation makes Penn State Altoona “home to the first and only ABET-accredited RTE program in the U.S.”

Will Trump fund Gateway? Maybe

New York Gov. Andrew Cuomo and New Jersey Gov. Chris Christie, along with 15 other elected officials from New York and New Jersey, met with President Donald Trump at the White House Sept. 7 to discuss the Gateway Project. Accounts of the meeting vary, but are somewhat positive.