Blue Ridge Connector

GPA: Blue Ridge Connector 95% Complete

The Georgia Ports Authority (GPA) on Jan. 22 announced that the Blue Ridge Connector, the Georgis Ports’ latest addition to its inland rail network, is now 95% complete and will open for operation later this year.

ITS Logistics U.S. Port/Rail Ramp Freight Index for December 2025. (Image Courtesy of ITS Logistics)

Intermodal Briefs: ITS Logistics, GPA

ITS Logistics issues its December U.S. Port/Rail Ramp Freight Index. Also, the Appalachian Regional Port, a joint effort of the State of Georgia, Murray County, Georgia Ports Authority (GPA), and CSX, logs its busiest November on record.

“Even in a challenging year [2024], we still found a way to grow by 12.5%, and I think one conclusion we can draw here is that connectivity is key,” Lynch told an audience of more than 1,700 Georgia business leaders and elected officials on Feb. 25, according to GPA.

For GPA, Containers Up, Capacity Growing

The Georgia Ports Authority (GPA) handled nearly 5.6 million TEUs (twenty-foot equivalent container units) in 2024, up 12.5% from 2023, making Savannah “the fastest growing container gateway on the U.S. East and

GPA: Second Busiest September on Record

In its second busiest September on record, the Georgia Ports Authority (GPA) handled 450,700 Twenty-Foot Equivalent Units (TEUs) last month, an increase of 12% or approximately 48,000 TEUs, compared to the same month last year.

A rendering, provided by the Georgia Ports Authority, of the Blue Ridge Connector terminal to be served by Norfolk Southern.

GPA Advances Blue Ridge Connector Project

Georgia Ports Authority (GPA) on Aug. 6 provided a progress report on its planned inland terminal, the Blue Ridge Connector in northeast Georgia, which Norfolk Southern (NS) in 2026 will link with